China Classification Society (CCS) has issued guidelines for the design, construction, inspection, and maintenance of semi-submerged propeller propulsion units.
These guidelines emphasize several key aspects:
- Product Inspection: Inspections are required after drawing approval, with emphasis on type testing of electrical components. All parts must have Marine Product Certificates, and non-compliant parts require inspections per CCS rules.
- Materials and Welding: Raw materials and major components must undergo material and non-destructive testing. Welding procedures need prior approval before manufacturing.
- Testing and Inspections: Key tests include:Hydraulic and tightness tests at pressures exceeding design limits.Function tests for steering and control systems.Endurance tests for new models, running for 500 hours under specific conditions.
- Installation and Sea Trials: Post-installation checks ensure compliance with approved designs, including functionality and tightness tests after launching.
- Surveys: Regular inspections confirm the operational status of systems, focusing on corrosion and securing devices, with special surveys for critical components.
LINK TO THE DOCUMENT
Sign up for our newsletter
It's free. No spam. Cancel anytime.
Related News
Withdrawal of ammonia control amendments in KR Technical Rules
Dec 20, 2024
KR, Sinokor, and HD Hyundai Marine Partner to Advance AI-Driven Ship Maintenance
Dec 17, 2024
ABS launches Unified Offshore Rules for Enhanced Navigation and Technology Support
Dec 04, 2024